Most of the shelving and furniture pieces were delivered in early October 2001 and the installation process began mid-month. Library staff began boxing and transferring the collection from the main library on a daily basis as the installation process progressed. The entire music collection was moved and shelved by December 2001. The music library was open for business throughout the entire process.
The staff workroom houses the media collection … |
… as well as staff printers and storage areas |
What was originally designed to be the Librarian's office became the Periodical Reading Room. This room is accessible from the reference area near the front of the library.
An entrance to the School of Music Keyboard Lab is accessible from within the library. |
The Periodical Reading Room during construction |
The Periodical Reading Room after construction |
Because the Librarian's office became the Periodical Reading Room, the room originally designated as media storage became the Librarian's office. It is located near the service desk.
The exterior of the Librarian's office |
The interior of the Librarian's office |